This project utilized a single slug catcher to cover (4) cryo trains being built at the site. Utilizing stock plate, the manifolds arrived on site in just 16 weeks with the total install completed in under 30 weeks.
Location: Lea County, NM
Design: (1) 8-finger slug catcher with double downcomers
Gas Flow: 880 MMSCFD
Storage: 2500bbls
Design Pressure: 1200psig
Specials: 16 week full fabricated manifold delivery
Line Pipe: Stock – 42” API 5L Line Pipe