
In a collaboration between an American manufacturer, international oil major, and Eastern European freight provider, a slug catcher was air freighted to a petroleum development in Iraq. This schedule critical project was engineered, fabricated and delivered in under 24 weeks.
Location: Majnoon Oil Field, Iraq
Design: (1) 6 – finger Slug Catcher
Gas Flow: 99 MMSCFD
Storage: 7,300bbls
Design Pressure: 1363 psig
Specials: Air Freight out of Kansas City International Airport
Line Pipe: 48” API 5L Line Pipe





























